Reservoir Project Site signage Onsite meeting with Sarah Lake Architecture during COVID Familiarising with the site Crazy Frank squeezing it through with 25mm either side Devil of a spot Sunset over slab preparations Pre-slab plumbing Membrane down Steel ready Steel in for phase 1 concrete pour Phase 1 concrete pour Burnished finish Burnished beauty Phase 2 concrete pour steel Phase 2 concrete finish Curing stage Sharp So sharp Salt and pepper Framing stage Air seal micro details Roof on and water resistant membrane begins Sunken lounge WRB water management details WRB water management details windows WRB and rainscreen water management details Insulation internals Shadowline details A new entrance Remodelling the existing External screen outriggers Outrigger details Outrigger details Ready for paint Painted and ready for its screen Plaster completion Plaster completion Planning matters A sense of space and scale Pre-painting screen battens Landscaper Paul enjoying the access Climatising timber floor Waterproofing done right Boxing for curved garden beds Exposed aggregate pathways Poured and complete Pathway to dreams Screen commencement So. Much. Planning Ready for verticals Pergola up Let the vertical batten install begins! Keeping up with painting as we go Over 3000 screws Coming together Trevor the painter working his magic Coming together Late nights where had Kitchen installed Morning sun shinning through the masterpiece Stair details intertwined with the joinery Stellar splashback Fitting the archways Details Arch preparation Almost handover Complex Professional builders internal clean Sundown Completion Arches in all their glory Mother nature meets architecture Scale